INSTRUMENT
INST-2026-0028
Airframe heavy maintenance — 12Y check
Listed by Singapore Aerospace MRO · Listed 28 Feb 2026
THE SLOT
Engine / AircraftB787-9
Work scopeAirframe heavy maintenance — 12Y check
Estimated duration111 days
Slot window15 Sept 2026 – 4 Jan 2027
MRO locationSingapore
Listed28 Feb 2026
B787-9 12Y check. Full structural inspection team committed. SB package finalized.
TIER AND COMMITMENT
RtW-2
Bond requirement35% of slot price
Confirmed at listingSlot, labor, all major parts and consumables confirmed
Listing fee paid$45,000
Cancellation termsCancellation with 20 business days notice; bond forfeited; fee applies
Transfer rightsTransferable under STSL
VERIFICATION
MSVA VERIFICATION STATUS
Verified
By Northbrook MRO Standards Bureau
Verified 5 Oct 2025
Re-verification due 5 Oct 2026
Verification scope
- Capabilities confirmed: CFM LEAP-1B, GE GEnx, RR Trent XWB, RR Trent 1000
- Certifications: CAAS, EASA Part-145, FAA Part-145, CAAC
- Slot allocation confirmed at listing
- Jurisdiction: Singapore